Sister company of Construplan construplan.com.mx
Civil — Division 03

Earthwork and road construction, the scope everything else waits on.

The civil scope that comes before everything else: clearing, moving and compacting dirt, then building what drives on it.

What we do

Nothing starts until the dirt is right.

Every other trade on a site is waiting on grading, on a pad, on an access road. When the civil contractor is a different company than the one installing the power and the conduit, that wait becomes somebody's change order.

01 — Excavation

Mass excavation and grading

Mass excavation and grading, from raw ground to the elevations the rest of the job is designed against.

02 — Pads

Site preparation and pads

Site preparation and pads, compacted for what is actually going to sit on them.

03 — Roads

Road and access-road construction

Road and access-road construction, including the access that a remote site needs before any other trade can reach it.

04 — Surface

Base course and paving support

Base course, aggregate and paving support underneath the finished surface.

05 — Drainage

Drainage and culverts

Drainage and culverts designed for the storm that shows up, not the average one.

06 — Utilities

Site utilities

Site utilities in the same corridor as the conduit and the power that follow them — one mobilization, not three.

Why it matters

The civil is where the other two divisions begin.

We did not add earthwork to look bigger. We added it because it is the scope that was stalling the other two.

One trench, three scopes

Drainage, site utilities, conduit and power usually share a corridor. Cutting it once, with one crew that knows what is going in behind it, is cheaper and faster than three contractors opening the same ground in sequence.

Grading decides the electrical

Where the pads land and how the site drains determines where the gear can go and how far the feeders have to run. Designing the civil in isolation is how a project ends up paying for conduit it never needed.

Access first

On remote and industrial sites the access road is not a line item at the end. It is the thing that decides whether anyone else can start at all.

Questions

Straight answers.

The things owners and GCs actually ask us before awarding a scope.

What does your earthwork scope cover?

Mass excavation and grading, site preparation and pads, road and access-road construction, base course and aggregate with paving support, and drainage, culverts and site utilities. It is the civil scope that has to happen before anything else can start.

Do you build access roads for remote sites?

Yes. Access-road construction is a normal part of the division, and it is often the first thing a site needs before any other trade can reach it at all.

Can you handle the utilities in the same trench work?

That is exactly the point of having all three divisions in one company. Drainage, culverts and site utilities are ours, and so are the conduit and the electrical that usually follow them into the same corridor. One mobilization instead of three.

Do you pave?

We do base course, aggregate and paving support. On paving itself we will tell you plainly what we self-perform on a given job and what we bring a specialist in for, rather than quoting it and figuring it out later.

How early should we bring you in?

Earlier than most owners do. Grading and drainage decisions made before anyone looks at where the power and the conduit have to run are the ones that get rebuilt. If the civil, the electrical and the telecom are designed against each other, someone pays to fix it.

Next step

Send us the site plan.

Send the grading plan and the schedule. We will tell you where the civil, the power and the conduit are fighting each other before it costs you a change order.